FEBRUARY 2025 INVOICING UPDATE:
Wastewater invoicing will now take place when you submit your wastewater site location application and/or process design report application. After submitting your application and engineering report, you will receive an invoice.
Please note that the invoice will expire 90 days after issuance.
Drinking water submittal application forms
- Drinking water construction completion form
- Drinking Water Design Submittal(Appendix B of Design Criteria for Potable Water Systems).
- Pilot/Demonstration Scale Application (Appendix C of Design Criteria for Potable Water Systems).
- Alternative Technology Acceptance Application (Appendix D of Design Criteria for Potable Water Systems).
- POU/POE BDR Drinking Water Design Submittal (Appendix J of Design Criteria for Potable Water Systems).
- Fillable PDF new public water system capacity planning manual.
Domestic wastewater submittal forms
- Site application forms (submit a Fee Information Request Form as needed):
- Section 22.6: New Domestic Wastewater Treatment Works.
- Section 22.7: Increasing or Decreasing the Design Capacity of an Existing Domestic Wastewater Treatment Plant.
- Section 22.7: Decreasing the Design Capacity of an Existing Domestic Wastewater Treatment Plant to 2,000 gpd or Less.
- Section 22.8: Interceptor Sewer Eligible for Certification.
- Section 22.8: Interceptor Sewer Not Eligible for Certification.
- Section 22.9: Lift Station.
- Section 22.10: Amendment of Existing Lift Station Site Location Approval.
- Section 22.10: Amendment of Existing Treatment Plant Site Location Approval.
- Section 22.11: Demonstration Project.
- Section 22.12: In-Kind Replacement.
- Section 22.13: Domestic Wastewater Treatment Plant Self-Certification Form.
- Section 22.13: Interceptor Self-Certification Form.
- Design forms (submit Fee Information Request Form as needed):
- Wastewater Design Criteria Submittal Form (accompanies process design report/basis of design report and final plans and specifications).
- Wastewater Design Capacity Evaluation Form.
- Process Design Report (PDR) Submittal Checklist - Wastewater Treatment Plant Project.
- PDR Submittal Checklist - Groundwater Discharge Projects.
- Basis of Design Report (BDR) Submittal Checklist - Lift Station Projects.
- BDR Submittal Checklist - Outfall Projects.
- Alternative technology forms:
- Special situation forms:
- Wastewater construction completion form.